Projects @ BIG

Ongoing Projects

  • WIN (01.07.2012 - 30.06.2014)
    Web of Needs INfrastructure
  • ARTIST (01.10.2012 - 30.09.2015)
    ARTIST: Advanced software-based seRvice provisioning and migraTIon of legacy SofTware
  • DARWIN (01.03.2012 - 28.02.2014)
    DARWIN: Model-driven Development and Evolution of Semantic Infrastructures
  • DK ADS (01.10.2012 - 30.09.2015)
    Doctoral College "Adaptive Distributed Systems"
  • FAME (01.01.2011 - 31.12.2013)
    FAME: Formalizing and Managing Evolution in Model-Driven Engineering
  • moliz (01.07.2011 - 01.07.2013)
    Model Execution based on fUML
  • IOS (01.10.2008 - 31.12.2013)
    Research Studio Inter-Organisational Systems
  • TheHiddenU (01.09.2010 - 31.08.2013)
    TheHiddenU – A Social Nexus for Privacy-Assured Personalisation Brokerage

Finished Projects

  • ebCrossborder (01.01.2007 - 31.01.2008)
    ebCrossborder - crossborder e-Billing in Austria
  • ebInterface 2011 (13.04.2011 - 28.02.2012)
    ebInterface 2011 - electronic invoicing
  • ebInterface 3.0 (01.01.2009 - 28.02.2010)
    ebInterface 3.0 - electronic invoicing
  • SWITCH09 (01.07.2009 - 31.08.2009)
    Rail track gauging Austrian Federal Railways
  • Admina.at (01.12.2005 - 30.09.2007)
    Admina.at goes Austria
  • AMOR (01.02.2009 - 30.09.2011)
    AMOR: Adaptable Model Versioning
  • BSopt (01.04.2008 - 30.09.2010)
    Business Semantics on top of Process Technology
  • ERPEL (01.05.2010 - 31.10.2012)
    E-business Registry Permitting Enterprise Liaisons
  • ebInterface 2010 (02.11.2010 - 31.12.2010)
    ebInterface 2010 - electronic invoicing
  • ebTransfer (01.01.2007 - 30.11.2007)
    ebTransfer - Design and Realization of Know-How Transfer for electronic Billing based on ebInterface
  • REA-ERP (01.11.2012 - 30.04.2013)
    Feasibility Study: ERP System Based on the Resource-Event-Agent (REA) Ontology
  • ModelCVS (01.01.2006 - 31.12.2007)
    ModelCVS: A Semantic Infrastructure for Model-based Tool Integration
  • PPI (01.10.2008 - 30.09.2011)
    Public Private Interoperability
  • TRACK&TRADE (01.10.2006 - 30.09.2008)
    TRACK and TRADE: Creating a Data Mart for Floating Car Data
  • TROPIC (01.03.2009 - 31.08.2012)
    TROPIC: A Framework for Model Transformations on Petri Nets in Color
  • WIT (01.01.2003 - 31.12.2007)
    Women's Postgraduate College for Internet Technologies
  • ZELESSA (01.01.2006 - 30.06.2007)
    ZELESSA: An Enabler for Real-time Business Intelligence

Other Initiatives

  • MDWEnet (08.2006 - ongoing)
    A Practical Approach to Achieving Interoperability of Model-Driven Web Engineering Methods
  • SmartMatcher (01.2006 - ongoing)
    Improving Automatic Matching Quality by SmartMatching